+91 124-4277519
info@Kdc-infra.com
Home
About Us
Services
ROAD ASSET MANAGEMENT
NETWORK SURVEY VEHICLE (3D-LCMS-2)
MOBILE BRIDGE INSPECTION UNIT
FALLING WEIGHT DEFLECTOMETER
BRIDGE HEALTH MONITORING SYSTEM (STS4-4 nodes)
AUTOMATIC COUNTER CLASSIFIER
RETRO REFLECTOMETERS
GROUND PENETRATING RADAR
NON-NUCLEAR GUAG
HIGHWAYS & EXPRESSWAY
BRIDGES
RAILWAYS & METROS
WATER & ENVIRONMENT SECTOR
STRUCTURES & BUILDINGS
Projects
Transportation Sector
Road Asset Management Sector
Water Environment Sector
Buildings and Structures Sector
Railway Sector
Career
Contact
Road Asset Management Sector Projects
Home
Projects
Rehabilitation & Up-gradation of NH-7305 (Maharajganj - Thuthibari)
Rehabilitation and Up-gradation from Km 0+000 to Km 39+150 of NH-7305 (Maharajganj Nichoul - Thuthibari) to two lane with paved shoulders in the State of Uttar Pradesh.
New 2 Lane Bypass (Jammu & Kashmir)
Construction of New 2 lane bypass from Km 176+532 (Near Doonipawa ex. Km 263+107) to Km 185+002 (Near Khudwani on NH-44) in the union territory of Jammu and Kashmir.
FWD Survey (Meghalaya)
Conducting Falling Weight Deflectometer (FWD) Survey in the State of Meghalaya.
Poanta Sahib - Hewna (NH-707)
Construction of 02-lane with paved shoulder 04-lane configuration of Poanta Sahib - Hewna Section Pkg-1 (Km 0.000 to Km 25.000) of NH-707.
4-Laning Mohari to Satai Ghat (NH-934)
4-Laning of Mohari to Satai Ghat Section NH-934 from Km 50+300 to Km 89.875 (Total Length 39.5 km) (Package-2) in the State of Madhya Pradesh.
Delhi–Vadodara Greenfield Alignment (NH-148N)
Construction of Eight Lane Carriageway starting near Junction at SH-44 to Junction with Keshopura Road (Km 115+700 to Km151+840) section of Delhi – Vadodara Green Field Alignment (NH-148N) in the State of Rajasthan Package 3&4.
Laning Jammu - Udhampur
Laning of Jammu - Udhampur road from Km. 15.000 to Km 67.000 (Jammu Bypass Udhampur) (Pkg No.NHDA-11/BOT/VI/J&K).
Survey & Data Processing (Himachal Pradesh)
Survey and data processing on about 3584 kms on roads in the State of Himachal Pradesh.
Kohla - Nasratpur (NH-222) Rehabilitation
Rehabilitation & Up-Gradation of Kohla -Nasratpur Section from Km 444+000 to 514+000 of NH-222 in the State of Maharashtra.
Routine Maintenance & PBMC (NH-25)
Routine Maintenance & Periodic renewal work of 2 lane paved shoulder/4lane of Barmer - Bagundi Km 0.00 to Km 74.100 of NH-25 in the state of Rajasthan on Performance Based Maintenance Contracts (PBMC) mode (NSV-FWD-RETRO & SAFETY AUDIT).
Consultancy – Dharuhera 2 Lanning Supervision
Consultancy services for independent engineer for supervision of 2 Lanning from(sector 18,19 0+000 to1053) km (sector18,24 0.000 to 1+656) km (sector 20,240+000 to 0+861) km (sector 18;19 0+000 to 0+053) KM of Dharuhera state of Haryana.
Raiganj - Dalkhola (NH-34)
Design and Construction of Raiganj - Dalkhola Section from Raiganj Dalkhola KM 398+000 Of NH-34 To KM 452+750 Of NH-34 (Design Chainage: 398+000 To KM 452+750) In the State of West Bengal.
NH548B Widening (Karnataka)
Widening to 4L+PS of NH548B from km 118.450 (near Shirguppi) to km 128.450 (near Ankali) in the state of Karnataka.
Dwarka Expressway Survey (Haryana)
Survey and Data Processing on about 600 lane kms Dwarka expressway in the state of Haryana.
NH-311 Rehabilitation (Rajasthan)
Rehabilitation of NH-311 from km=0+000 to 7+400 & km=18+000 to 36+600 in the state of Rajasthan on EPC mode.
Black Spots Rectification & Service Road (UDHAMPUR)
Rectification of MORTH Identified Black Spots JK-02-020(GOLE MELA) and construction of service Road to existing VUP at SINGOOR on Jammu UDHAMPUR Section of NH-44 (km 14+200) in UDHAMPUR.
ROB at NH-56 (Pkg-I)
Construction of ROB at Project Ch.146.533 of NH-56 (Pkg-I) along with its approaches and slip roads on New NH-731.
Sautada to Shirampur (NH-561)
Project Widening Reconstruction & Up-Gradation to 2-lane with Paved Shoulder Four Lane Configuration for the work of Sautada to Shirampur Section of NH-561 from Design Km 86+300 to Km125+589 (Design Length-39.285Km) in the State of Maharashtra on EPC mode.
Abohar-Sito Gunno-Dabwali (NH-354E)
Rehabilitation & up gradation to 2 lane with paved shoulders of Abohar-Sito Gunno-Dabwali road from km.0.00 to km. 50.885 of nh-354e including construction of one high level major steel bridges.